Committed to profitably reducing greenhouse gas emissions

A New Era of Clean Energy

RED-Rochester in cooperation with its parent companies, Ironclad Energy Partners and Stonepeak Infrastructure Partners, has completed a ~$75M investment that fully retired 127 years of continuous coal-fired operations in Eastman Business Park and have replaced it with four new clean-burning natural gas fired boilers and converted an existing coal fired boiler to natural gas.

LEARN MORE

A New Era of Clean Energy

RED-Rochester in cooperation with its parent companies, Ironclad Energy Partners and Stonepeak Infrastructure Partners, has completed a ~$75M investment that fully retired 127 years of continuous coal-fired operations in Eastman Business Park and have replaced it with four new clean-burning natural gas fired boilers and converted an existing coal fired boiler to natural gas.

LEARN MORE

What Eastman Business Park Has to Offer

One of the world’s most comprehensive industrial parks, Eastman Business Park in Rochester, NY has the utilities, infrastructure, technical services, support services, space and complementary regional resources to benefit a wide range of industry verticals.

Red-Rochester provides the following state-of-the-art utilities for Eastman Business Park:

ELECTRIC

125,000 KW firm capacity with backup inter-connections with public utility. Generated at 13,800 volts and distributed through RED-Rochester’s local micro grid with redundant underground feeder cables to double-ended load centers/substations for highest reliability and quality. Standard delivery is nominal 480 volt, 3 phase alternating current.

STEAM

1.5M lbs / hour firm capacity from utility-grade boilers with emergency backup boilers. Generated at 1,400 psig/900°F and supplied at different nominal pressure levels of 260 psig, 140 psig, 70 psig and 5 psig.

CHILLED WATER

40,000 tons installed capacity of tri-generation – nominal supply temperature 40°F

PROCESS WATER

54 million gallons per day nominal capacity. Backup from public water systems.

WASTE WATER TREATMENT & SEWER

36 million gallons per day capacity with Title V / RCRA permitted multiple hearth incinerator.

NITROGEN

148,000 standard cubic feet per hour installed on-site plant capacity with equivalent capacity of backup liquid vaporizers. Minimum purity is 99.999% with a nominal gauge pressure of 80 psig and a maximum dew point of -100°F.

DEMINERALIZED WATER

Treated process water using anion and cation exchangers with maximum conductivity of 4 micromhos

HAZARDOUS WASTE DISPOSAL

Hazardous waste management supplied by Clean Harbors

SOLID WASTE DISPOSAL

General trash, metal, plastic and corrugated service by Waste Management. Dock service, roll offs and compactors. Special waste disposal. Non-hazardous waste liquid waste removal.

COMPRESSED AIR

40,000 standard cubic feet per minute installed capacity with a nominal gauge pressure of 80 psig and a maximum dew point of 55°F.

HIGH-PURITY WATER

300 gal/min firm capacity of reverse osmosis deionized water – minimum resistivity 2 megohms

NATURAL GAS

Available